Case study

Solos Vital

A product launch case for a lifestyle thermos brand: production, visual content, packaging and marketplace-ready product cards.

We will analyze your request for free and suggest the best solutions

Product video

What we did

For Solos Vital, Hainanet coordinated the production of branded thermoses and prepared the visual and commercial materials needed for product launch.

We will analyze your request for free and suggest the best solutions

Produced branded thermoses

Organized and carried out product photography

Designed product cards for marketplace and online sales

Developed the design of interchangeable straps

Designed packaging and printed materials

Prepared advertising materials for product promotion

Solos Vital

Project pipeline

A test timeline showing how a product launch can move from idea discussion to production, shipment and marketplace preparation.

  • 01

    Idea discussion

    4 days

    Clarifying the product format, target audience, visual direction, use cases and launch requirements.

  • 02

    First design sketches

    5 days

    Preparing first visual concepts for the thermos, straps, packaging and product communication.

  • 03

    Supplier search and quotation

    7 days

    Selecting production options, checking MOQ, materials, color options, branding methods and preliminary costs.

  • 04

    Sample production

    14–21 days

    Producing the first sample to check shape, coating, print quality, strap attachment and packaging structure.

  • 05

    Sample approval and corrections

    5–7 days

    Reviewing the sample, adjusting details and preparing the final specification for batch production.

  • 06

    Batch production

    25–35 days

    Manufacturing the thermoses, accessories and packaging according to the approved specification.

  • 07

    Photo and content production

    5–8 days

    Creating product photos, lifestyle images, product cards and advertising materials for the launch.

  • 08

    Quality control and packaging

    3–5 days

    Checking the batch, packing goods and preparing documents for shipment.

  • 09

    Dispatch and transit time

    14–30 days

    Shipping the goods to the destination market. Timing depends on route, transport type and customs workload.

We will analyze your request for free and suggest the best solutions

Solos Vital

Visual materials

The project included a full visual layer: product photography, packaging presentation, lifestyle assets and commercial images for sales channels.

Solos Vital thermos product photo
Solos Vital lifestyle product photo
Solos Vital packaging design

01

Thermos production

The product was prepared as a finished branded item with attention to presentation, accessories and packaging.

02

Photography and product content

We created clean product visuals that can be used in product cards, advertising layouts and launch materials.

03

Packaging and accessories

The visual system was extended to packaging, interchangeable straps and promotional materials.

We will analyze your request for free and suggest the best solutions